|
|
|
Gulf Air Lounge Heathrow Terminal 3Client / Project / LocationGulf Air / Lounge / T3 Departures.Role / ServiceJohn Gray was the HCL project manager for HCL. Project DetailsLounge envelope, M&E, Floors, Ceilings, Decs, Specialist Joinery & FFE sourcing. Programme4 weeks from strip out finished area ready for occupation. Programme ConstraintsLead-in of specialist joinery & FFE. ValueOverall project value: £ 125K. Procurement system or methodNegotiated based on construction drawings & site visit to Bahrain. Established Supply chainAll works completed using directly employed staff. Learning
Photos |
Related Projects
Other Projects with the same keywords:
AIRPORT LOUNGES- British Airways CIP Lounge Gatwick North Terminal
- Malaysian Airlines Heathrow Terminal 3
- BMI Domestic Lounge Heathrow Terminal 1
- KLM Holideck Heathrow Terminal 4
- Virgin Departures Lounge Interim Refurbishment Heathrow Terminal 3
- British Airways CIP Lounge Gatwick North Terminal
- Malaysian Airlines Heathrow Terminal 3
- BMI Domestic Lounge Heathrow Terminal 1
- KLM Holideck Heathrow Terminal 4
- Virgin Departures Lounge Interim Refurbishment Heathrow Terminal 3
- BAA Visitors Centre
- Lounge Maintenance & Specialist Projects
- DTZ - Cardinal Point
- Malaysian Airlines Heathrow Terminal 3
- BMI Domestic Lounge Heathrow Terminal 1
- WBC 1 HAL MD Office Refurbishment
- Heathrow T3 Landside Catering
- KLM Holideck Heathrow Terminal 4
- SAA Departures & Arrivals Lounges Interim Refurbishment
- WBC 1 Ground & 1st Floor Refurbishment
- Virgin Departures Lounge Interim Refurbishment Heathrow Terminal 3
- Building 941
- Heathrow T1 Plaza Retail Reconfiguration









