Malaysian Airlines Heathrow Terminal 3Client / Project / Location
Malaysian Airlines / Departures Lounge / Heathrow Terminal 3 Role / Service
Angelo Zenga HCL Project Manager. John Gray HCL M&E Manager. Project Details
Lounge Envelope, M&E installation, Flooring, Ceilings, Decs, Specialist Joinery & FFE. Programme
4 weeks from strip-out finished area ready for occupation. Programme Constraints
Lead-in of joinery items. (Reduced due to in-house sourcing). Value
Overall project value: £ 85K. Procurement system or method
Negotiated based on construction drawings. Established Supply chain
All works completed using directly employed staff. Learning
Photos |
Related Projects
Other Projects with the same keywords:
AIRPORT LOUNGES- British Airways CIP Lounge Gatwick North Terminal
- Gulf Air Lounge Heathrow Terminal 3
- BMI Domestic Lounge Heathrow Terminal 1
- KLM Holideck Heathrow Terminal 4
- Virgin Departures Lounge Interim Refurbishment Heathrow Terminal 3
- British Airways CIP Lounge Gatwick North Terminal
- Gulf Air Lounge Heathrow Terminal 3
- BMI Domestic Lounge Heathrow Terminal 1
- KLM Holideck Heathrow Terminal 4
- Virgin Departures Lounge Interim Refurbishment Heathrow Terminal 3
- BAA Visitors Centre
- Lounge Maintenance & Specialist Projects
- DTZ - Cardinal Point
- Gulf Air Lounge Heathrow Terminal 3
- BMI Domestic Lounge Heathrow Terminal 1
- WBC 1 HAL MD Office Refurbishment
- Heathrow T3 Landside Catering
- KLM Holideck Heathrow Terminal 4
- SAA Departures & Arrivals Lounges Interim Refurbishment
- WBC 1 Ground & 1st Floor Refurbishment
- Virgin Departures Lounge Interim Refurbishment Heathrow Terminal 3
- Building 941
- Heathrow T1 Plaza Retail Reconfiguration