|
|
|
WBC 1 Ground & 1st Floor RefurbishmentValue£1m Programme8 weeks DetailsThe strip out and refurbishment of the ground and 1st floors of WBC1. The project was fast-tracked with approx 10 days lead-in. We were also required to work over the Christmas break to achieve BAA timescales. Photos |
Related Projects
Other Projects with the same keywords:
BAAHEATHROW
- BAA Visitors Centre
- Lounge Maintenance & Specialist Projects
- DTZ - Cardinal Point
- Gulf Air Lounge Heathrow Terminal 3
- Malaysian Airlines Heathrow Terminal 3
- BMI Domestic Lounge Heathrow Terminal 1
- WBC 1 HAL MD Office Refurbishment
- Heathrow T3 Landside Catering
- KLM Holideck Heathrow Terminal 4
- SAA Departures & Arrivals Lounges Interim Refurbishment
- Virgin Departures Lounge Interim Refurbishment Heathrow Terminal 3
- Building 941
- Heathrow T1 Plaza Retail Reconfiguration
OFFICE FIT-OUT
PROJECTS
- BAA Visitors Centre
- Lounge Maintenance & Specialist Projects
- DTZ - Cardinal Point
- WBC 1 HAL MD Office Refurbishment
- Heathrow T3 Landside Catering
- SAA Departures & Arrivals Lounges Interim Refurbishment
- Building 941
- Heathrow T1 Plaza Retail Reconfiguration
- BAA Visitors Centre
- Lounge Maintenance & Specialist Projects
- DTZ - Cardinal Point
- WBC 1 HAL MD Office Refurbishment
- Heathrow T3 Landside Catering
- SAA Departures & Arrivals Lounges Interim Refurbishment
- Building 941
- Heathrow T1 Plaza Retail Reconfiguration
WORLD BUSINESS CENTRE










